Third Party Solar Power Purchase Agreement
"I need a Third Party Solar Power Purchase Agreement for a 500kW rooftop solar installation on our commercial building in Singapore, with a 20-year term starting March 2025 and including battery storage options and export to grid provisions."
1. Parties: Identification of the Solar Provider and the Property Owner/Energy Purchaser
2. Background: Context of the agreement, including property details and purpose of the solar installation
3. Definitions: Key terms used tHRoughout the agreement including technical, financial, and legal terminology
4. System Installation: Terms regarding installation, timeline, specifications, and compliance requirements
5. Energy Purchase Terms: Pricing structure, payment terms, minimum guarantees, and billing procedures
6. Term and Termination: Duration of agreement, renewal options, and termination conditions
7. Operation and Maintenance: Responsibilities for system maintenance, monitoring, and performance guarantees
8. Access and Property Rights: Provider's access rights and property usage terms
9. Representations and Warranties: Standard warranties and representations from both parties
10. Insurance and Liability: Insurance requirements and liability allocation
1. Purchase Option: Terms for system purchase by property owner at end of term or specified intervals
2. Environmental Attributes: Ownership and trading rights for renewable energy credits and environmental benefits
3. Grid Integration: Terms and conditions for grid connection and power export arrangements
4. Battery Storage: Specific terms and conditions for battery system operation and maintenance
1. Schedule 1 - System Specifications: Detailed technical specifications of the solar PV system and components
2. Schedule 2 - Pricing Schedule: Detailed pricing structure, rates, and annual escalators
3. Schedule 3 - Performance Guarantees: Specific performance metrics, guarantees, and remedies
4. Schedule 4 - Installation Timeline: Project timeline, milestones, and completion requirements
5. Schedule 5 - Site Plan: Installation location, layout drawings, and technical diagrams
6. Schedule 6 - Maintenance Schedule: Detailed maintenance requirements, schedules, and procedures
7. Schedule 7 - Insurance Requirements: Specific insurance coverage requirements and minimum limits
8. Schedule 8 - Form of Performance Bond: Template and requirements for performance bond or security
Authors
Find the exact document you need
Download our whitepaper on the future of AI in Legal
³Ò±ð²Ô¾±±ð’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; ³Ò±ð²Ô¾±±ð’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
Our bank-grade security infrastructure undergoes regular external audits
We are ISO27001 certified, so your data is secure
Organizational security
You retain IP ownership of your documents
You have full control over your data and who gets to see it
Innovation in privacy:
Genie partnered with the Computational Privacy Department at Imperial College London
Together, we ran a £1 million research project on privacy and anonymity in legal contracts
Want to know more?
Visit our for more details and real-time security updates.
Read our Privacy Policy.