Create a bespoke document in minutes, Â or upload and review your own.
Get your first 2 documents free
Your data doesn't train Genie's AI
You keep IP ownership of your information
Environmental Risk Assessment Form
"I need an Environmental Risk Assessment Form for a new chemical manufacturing facility in Singapore's Jurong Industrial Estate, focusing particularly on hazardous material handling and waste management, with completion required by March 2025."
1. Project Information: Details of the project/activity being assessed, including scope, purpose, and responsible parties
2. Site Description: Physical characteristics and current environmental conditions of the site, including surrounding land use and sensitive receptors
3. Hazard Identification: Systematic identification of potential environmental hazards and their sources
4. Risk Assessment Matrix: Detailed assessment of likelihood and consequences of identified risks using standardized evaluation criteria
5. Control Measures: Existing and proposed measures to mitigate identified risks, including engineering controls and administrative procedures
6. Monitoring Plan: Procedures for ongoing monitoring of environmental impacts, including measurement methods and frequency
1. Climate Change Impact Assessment: Detailed analysis of project's contribution to climate change and adaptation measures, required for projects with significant carbon footprint
2. Public Consultation: Documentation of public feedback and responses, required when project affects residential areas or public spaces
3. Alternative Analysis: Assessment of alternative approaches or locations for major development projects with multiple viable options
1. Schedule A - Environmental Monitoring Data: Historical environmental data and baseline measurements for air, water, noise, and soil quality
2. Schedule B - Technical Specifications: Detailed technical information about equipment, processes, and control measures
3. Schedule C - Site Maps and Plans: Geographical information, site layouts, and location of environmental monitoring points
4. Schedule D - Emergency Response Procedures: Detailed procedures for responding to environmental emergencies and incidents
5. Schedule E - Compliance Certificates: Copies of relevant environmental permits, certifications, and compliance documentation
Authors
Find the exact document you need
Download our whitepaper on the future of AI in Legal
³Ò±ð²Ô¾±±ð’s Security Promise
Genie is the safest place to draft. Here’s how we prioritise your privacy and security.
Your documents are private:
We do not train on your data; ³Ò±ð²Ô¾±±ð’s AI improves independently
All data stored on Genie is private to your organisation
Your documents are protected:
Your documents are protected by ultra-secure 256-bit encryption
Our bank-grade security infrastructure undergoes regular external audits
We are ISO27001 certified, so your data is secure
Organizational security
You retain IP ownership of your documents
You have full control over your data and who gets to see it
Innovation in privacy:
Genie partnered with the Computational Privacy Department at Imperial College London
Together, we ran a £1 million research project on privacy and anonymity in legal contracts
Want to know more?
Visit our for more details and real-time security updates.
Read our Privacy Policy.